EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
DaveBellairs
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (655)
Research
Workshop
- (4)
Empennage
- (14)
Fuselage
- (54)
Firewall
- (78)
Tail Feathers
- (40)
Wings
- (105)
Controls
- (6)
Avionics
- (152)
-
Starter wire and...
-
Left mag rpm sensor
-
More ACM harnesses...
-
ACM wire harnesses
-
Reinstalled throttle...
-
Avidyne Nav tray
-
Stick grips and...
-
Finished stick grips
-
More stick grip work
-
Pilot stick grip
-
Stick grips
-
Control sticks and...
-
Hall sensor and red...
-
Hall sensor wires
-
Shunt wires and red...
-
More engine sensor...
-
Unknown wires and...
-
Engine sensor...
-
EGT/CHT connectors
-
More wire routing...
-
More wire routing...
-
Stick wiring harness
-
Stick grips, wire...
-
Roll servo wires,...
-
SV-EMS tray, Roll...
-
Word from AFS on...
-
Stick grips and wire...
-
Tail light wires and...
-
More wire security
-
Stick grips
-
Pitot and static...
-
Pitot tube routing...
-
Aileron trim wires...
-
Mid fuselage wire runs
-
Defrost fans wire
-
Aircraft ACM forward...
-
Aft wires
-
More flap position...
-
Tail light and ELT...
-
Mounted Hall sensor
-
Hall Sensor mount
-
Engine ground wire...
-
Connected boost pump...
-
Flap position...
-
Alternator #2 wiring
-
ANL limiters
-
40A ANL and flap...
-
B&C voltage...
-
ANL amp limiter...
-
Pitot heat...
-
Alternator wire and...
-
ACM power cable
-
ACM power cord
-
ACM nutplates and...
-
Ran the cable for...
-
ADSB antenna
-
Needed wires
-
Throttle cable
-
Ammeter shunt and...
-
Corrugated Tubing...
-
Nutplates for...
-
More subpanel nutplates
-
Nutplates on subpanel
-
Subpanel nutplates
-
Populated ACM
-
Pitot static tie down
-
Coax connectors
-
Coax cable lebgth
-
ELT Antenna
-
AP Pitch servo wires
-
Edge trim and pitch...
-
New transponder coax...
-
Rerouting...
-
Antennae doublers...
-
Antennae doubler plates
-
Nutplates on subpanel
-
ADAHRS standoffs and...
-
ADAHRS bracket
-
ADAHRS bracket
-
SV cable and tie downs
-
More ELT wire...
-
ELT and OAT wiring
-
Flap motor connectors
-
Trim wires
-
Reran wires
-
Wire tie downs
-
Connectors and tie...
-
Pitot lines and flap...
-
Finished tubing runs
-
More corrugated...
-
Corrugated tubing runs
-
Tubing angles
-
Flap/trim connector...
-
Flap position wires
-
Corrugated tube mount
-
Removing Floor panels
-
Finding room and a...
-
Pitot
-
Antenna coax connectors
-
Coax and ADSB antenna
-
Transponder and comm...
-
Pitot tube and bracket
-
Pitot tube and...
-
Marked pitot mast...
-
Pin removal tool and...
-
Antenna wire...
-
More tie downs and...
-
Pitch and roll trim...
-
Wire tie downs in...
-
Roll servo safety wire
-
Roll servo range of...
-
Roll servo over...
-
Roll servo wires and...
-
Finished SV-EMS...
-
SV-EMS 220 tray
-
SV-EMS bracket arm
-
SV-EMS bracket
-
Wiring and avionics...
-
Aft wire tie downs
-
Wire securing
-
Throttle brackets
-
Roll servo connector...
-
Pitch servo wiring
-
Pitch servo wiring
-
ELT antenna
-
Flap motor wire
-
Flap motor wires
-
Finished elevator...
-
Elevator trim servo...
-
Elt shielded wire
-
ELT and wing wiring
-
Elevator trim wires
-
Avidyne Nav rear...
-
More planning and...
-
More component...
-
Filling the subpanel
-
Panel attach angles
-
Panel brackets and...
-
Subpanel cutout for...
-
More subpanel work
-
Subpanel ribs
-
Subpanel ribs
-
Panel Attach angles
-
Trimmed subpanel and...
-
Panel delivered
-
ELT and B&C...
-
Elt mount
-
ADHRS
-
Avionics
-
Heated seat switches
-
Stick grip and...
-
Infinty stick grip
Lighting
- (13)
Instrument Panel
- (9)
Landing Gear
- (4)
Engine
- (159)
Propeller
- (1)
Fuel System
- (7)
Interior Finish
- (3)
Paint / Decals
- (6)
Inspection
Tools
Builder Name:
Dave Bellairs
-
Project:
Vans - RV-7
-
VIEW REPORTS
Total Hours:
1467.9
Total Flight Time:
Start/Last Date:
Jun 24, 2017 - No Finish Date
Engine:
Lycoming IO-360
Propeller:
Whirlwind 200RV
Panel:
Advanced Flight Systems Avionics
Friendly URL:
https://eaabuilderslog.org?s=DaveBellairs
Home or Last Project Picture
May 23, 2023
Roll servo safety wire
- (1 hour)
Category: Avionics
What a difference a day makes. Safety wired the two lower bolts on the roll servo mount and was successful on the first try. Drilled a hole in the upper bracket using the pneumatic drill and safety wired the upper bolt as well. Went surprisingly well given the tight quarters of the access hole. Safety wire remains from previous tries.
5D8B2DB0-09EF-4B84-A6C2-4A615B46222B.jpeg
6587D223-7E65-4C26-A9C8-61B2A1A13E32.jpeg
1C2AC674-A871-433D-B9F1-FB53473A9E24.jpeg
E50CE35D-E843-48AE-A766-112527AE35BA.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.